ATM Delivery & Rigging
• Deliver the ATM to the rigger’s local warehouse
• Up to 30 days warehousing for the ATM and installation materials
• ATM handling to accommodate local staging with adequate lighting, power, and environmental conditions upon request (Kaba-Mas lock installation)
• Deliver the ATM and installation materials from the local warehouse to the installation site using a padded van with air ride suspension and adequately rated lift gate
• Clean floor and walls if exposed where previous ATM was positioned
• Unload new ATM and move into position maintaining the integrity of your environment (surround installation will be priced separately)
• Remove new ATM packaging from the installation site
• Provide weather proofing (caulking, insulating)
• Install new A/C and data surge suppression (provided by ATMFUSE), given that physical access to the ATM location is free and clear per the site prep specifications
• Connect the power and data communications lines to the ATM
• Disconnect/reconnect alarm/security cables and apply ATM decals (if applicable)
• Power-up ATM
• Review ATM installation and receive branch acceptance signoff (if applicable)
• Complete site-specific Installation Check List and take digital photos